Performance Summary - Cost/Time

Description

The Performance Summary Report is designed to show where actual performance differs from expectation against 2 key performance measurements, Cost and Time stored in an Activity.
 
 
Report Definition File Performance Summary.xslt
Typically Found In

\Program Files\Triaster\Publication Server\Config Files\[LibraryName]\[SiteName]\

Version 10.1 onwards - Location change: \ProcessLibraries\ReportExchange

Download Available from Report Exchange Yes, see Reports
Expected Input Type Triaster catalogue.xml
Output Type html
 
Example Report (click on image):
 
 

Report Fields 

 
Report Column Heading Corresponding Property Field Name Where one Exists Excel Column where one exists  Comments
Activity Name
Name (The displayed text of the Activity) Text
Responsibility
 
Responsibility Prop:Responsibility Activity Property
Total Cost

TotalCost Prop:TotalCost Activity Property
Target Total Cost TargetTotalCost Prop:TargetTotalCost Activity Property 
Variance
<Calculated Field> Displays "redlight.gif" if TotalCost >= TargetTotalCost otherwise leaves the cell blank. redlight.gif must exist in the same folder as the output html file
Elapsed Time
ElapsedTime Prop:ElapsedTime Activity Property
Target Elapsed Time
TargetElapsedTime Prop:TargetElapsedTime Activity Property
Level Level (the calculated level of the Activity)    

Change History

Version Release Date Status  Comments 
Not Versioned 12/10/2009 The first attempt at providing a report to show how performance above or below target could be provided
v1.0 26/02/2010 Available in Report Exchange 

Added date Modified and report version number

Added link to list of reports html

added link to report exchange

Altered description

changed reference to .css file

Added icon image to top left of report

v1.1 19/04/2010 Released

Altered Node Parameter

Added comment to enable dynamic List of Reports

changed report name

deleted link to list of reports.html

v1.2 20/04/2010 Released  Link to css reverted to relative path
v1.3      17/11/2010     Released Rounded totalcost and targettotalcost fields to whole numbers.
v1.4          30/11/2010      Released Added total fields for variance, elapsed time and target elapsed time

Planned Enhancements

Date Expected Description Completed
TBC

Include a variance field for elapsed time

 
Comments