KB‎ > ‎

Connection points wrongly positioned after Excel export/import

Ref: AR20090427
Development Ref: 47
Last Edited: 22nd August, 2011
 
Fixed in PN 11.1

Symptoms:

If a Deliverable has 4 or more connections points on its right hand side (which are, for example, connected to corresponding Activities), one of these connection points moves to the top of the Deliverable after having done Excel export/import.

Causes:

Data about positioning of connection points being saved incorrectly.

Workaround:

Users should be aware of this issue, although it is purely cosmetic and should be addressed in a future release.
Comments