KB‎ > ‎

Connection points drop when using the Triaster connection method

Ref: PEV201103281732
Defect Id: 2633326 
Last Edited: April 4th, 2013
 
Description:
Drop an activity on the page. Right click and select 2 or more connection points. Close the dialogue box and go back into properties and select the inputs and outputs. When you select OK Process Navigator reverts back to 1 connection point on the shape.
 
Cause:
Under investigation, but it is not thought at this stage to be a problem with the stencil.
 
Workaround:
Select the connection points after the connection has been made.
 
Applies to:
  • Process Navigator versions 13.1 and earlier.              Fixed in PN 13.2
Comments